Actu Spatiale

Retrouvez toutes les actualités de la conquête de l’espace

#spaceexploration – by @orbital_atk on Instagram

NASA’s Booster Fabrication Facility at @nasakennedy has been around since the shuttle program in the mid-1980s. Today, we are using the building to prepare our solid rocket boosters for the Exploration Mission 1 (EM-1) flight of NASA’s Space Launch System, expected to launch next year. These boosters are similar to those that flew on 2009’s Ares I-X mission. Here, our Director of KSC Engineering, Larry Clark, shows off a skirt from one of the boosters of the Ares I-X mission inside the BFF. Previously flown hardware, such as this booster skirt, is being used to prepare for upcoming missions. Photo: Mark Deep/Spaceflight Insider